day 24 and 25…they’re still heeere

We had been back and forth as to whether we should have a full masonry fireplace built or put in a more efficient wood burning insert.  After much research on Dave’s part, we decided on an insert, as long as we could find one that would still give us the look of a massive wood burning fireplace that we feel every log cabin needs.  After finding just the right one, Dave, after more research, decided he would be able to install it himself and went ahead and placed the order. Expecting it to arrive after the crew had left, he had it delivered it to our Midlothian residence, hoping it would be in smaller pieces as the total weight would be 600lbs.  We were rather surprised when in showed up two days later, on two separate pallets, one of which we were able to break into smaller sections to get into my van, the other, the insert itself, in one complete piece and impossible for Dave and Max to lift even with a hand truck.  I’d like to give a shout out to our awesome neighbors, Brian and Jason Astroth, and Bill Durow, who came over to lend Dave a hand in hoisting the massive thing onto our trailer so we could haul it down the the cabin…thanks guys we owe you one!!! Once down at the site, it took all six crew members plus Mr. Lipham and Dave, to heave it up the four feet onto the front porch and then bring it into the great room.  Thank goodness they were still here when it arrived! Unfortunately, I was sick that day so there are no photos of the whole production. 😦

It came as no surprise to Dave and I when the end of today arrived and our Battle Creek crew had yet to wrap things up as we had thought it incredibly optimistic of Mr. Lipham when he set today as the new finish date.  They had ended up losing two crew members durning the course of the time that they have been here which has slowed down the progress somewhat and, in addition, there was a discrepancy between what the Battle Creek rep had agreed to have completed for us and what Mr. Lipham and his crew had been expecting to complete. Fortunately for us, Mr. Lipham and crew have been great to work with and, despite running way over their expected finish date, they’ve been knocking out much of the finish work on the outside that they were not expecting to have to do.

They have spent the past two days working on the roof and porch trim, running more electric, starting the steps between the first and second floor and figuring out where all the railings need to be placed.

Advertisement
Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

Post navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: