day 26-29….and they’re done…

Day 26

It was not even remotely a surprise to Dave and I when, at the end of the day last Monday, the crew was still not finished. However, they had completed the stairs to the second second floor (excellent job José!), attached the front porch rails, put in the fixed widows in the great room, as well as the heavy detail on the roof trim. Dave stayed long after the sun had set and they were still working on laying the last layer of roof felt, in the dark, using their iPhones for light!  Heavy rain was due to set in the following day so it was imperative that they get the felt down before they quit for the night.

Day 27

I drove down Tuesday morning, expecting the crew to be finishing up and leaving that afternoon, and I wanted the opportunity to say goodbye and to thank everyone for all their hard work.  The rain had already begun and there was a bustle of activity inside and outside when I arrived. It seemed clear to me as soon as I arrived that there was still way too much left undone for them to really be leaving that afternoon. However, I knew that even if José and his crew didn’t leave, Mr. Lipham still needed to leave by the end of the day in order to get home to his family in Tennessee in time for Thanksgiving. Shortly after I arrived, it was discovered that they were 150′ short of roof flashing and asked if I’d run up to Home Depot to pick some up.  Not a huge deal, but the closest Home Depot is thirty minutes back in the direction I’d just driven from. By the time I drove up there, bought the flashing and drove back to the work sight, I knew I’d have to turn around and leave as I had to get home to start prepping for our own Thanksgiving festivities. So much for my thoughts of hanging out to get a group shot of the guys and to say a formal farewell before they wrapped things up and pulled away. There was such a storm of activity inside when I got back, as the crew worked to get things finished, that I felt I was in the way, so, I just snapped a couple of photos, expressed my thanks to Mr. Lipham, wished him a Happy Thanksgiving and off I went in the rain.

Dave went down later that afternoon, after I left, and was able to get the guys to pause for a moment to snap a group shot of the guys on the front porch with his iPhone shortly after he arrived. (You can see in the photo that the rain was pretty heavy at this point.) Regrettably, I had chosen not to leave my camera down there for him to use when I left, so the photo was not the great shot I had hoped for. Still, I’m glad he took it as it was better that not having taken one at all.

IMG_2311

The Coleman Cabin building crew! From left to right- Mateo, Raymond, Mr. Lipham, José, Talon, Carlos, Nelson and Miguel

As he left Tuesday evening, they were still working on putting up the railing on the deck, again in the dark, this time using a flashlight that he had happened to bring along. Mr. Lipham did go ahead and take off so he could get home in time for the holiday leaving José and his J. M. Log Craftsman crew behind to finish.

Day 28-29

Dave went back down for a short time Wednesday to find them working away diligently in the heavy, cold rain, pausing every now and then to try and dry their coats by the fire.  They worked through the day Wednesday and finally finished on Thanksgiving day.  Needless to say we were not there to witness them wrap things up and to wish them well as they drove away. Such an anticlimactic ending to the dry in phase of this building process.  Mr. Lipham and Andy will be back in a few weeks to finish up the wiring and staining and to put in the basement windows that had to be reordered as the ones that had been sent did not fit properly.

We went down after Thanksgiving to check things out and, as we walked through the place taking in all of the details, we couldn’t have been more pleased.  It was such a great experience dealing with Mr. Lipham, José and the rest of the J. M. Log Craftsman team ( http://www.jmlogcraftsman.com/ ) and we can’t even begin to express our gratitude and appreciation for all of the effort that they put in to building our home.

Advertisement
Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | 2 Comments

day 24 and 25…they’re still heeere

We had been back and forth as to whether we should have a full masonry fireplace built or put in a more efficient wood burning insert.  After much research on Dave’s part, we decided on an insert, as long as we could find one that would still give us the look of a massive wood burning fireplace that we feel every log cabin needs.  After finding just the right one, Dave, after more research, decided he would be able to install it himself and went ahead and placed the order. Expecting it to arrive after the crew had left, he had it delivered it to our Midlothian residence, hoping it would be in smaller pieces as the total weight would be 600lbs.  We were rather surprised when in showed up two days later, on two separate pallets, one of which we were able to break into smaller sections to get into my van, the other, the insert itself, in one complete piece and impossible for Dave and Max to lift even with a hand truck.  I’d like to give a shout out to our awesome neighbors, Brian and Jason Astroth, and Bill Durow, who came over to lend Dave a hand in hoisting the massive thing onto our trailer so we could haul it down the the cabin…thanks guys we owe you one!!! Once down at the site, it took all six crew members plus Mr. Lipham and Dave, to heave it up the four feet onto the front porch and then bring it into the great room.  Thank goodness they were still here when it arrived! Unfortunately, I was sick that day so there are no photos of the whole production. 😦

It came as no surprise to Dave and I when the end of today arrived and our Battle Creek crew had yet to wrap things up as we had thought it incredibly optimistic of Mr. Lipham when he set today as the new finish date.  They had ended up losing two crew members durning the course of the time that they have been here which has slowed down the progress somewhat and, in addition, there was a discrepancy between what the Battle Creek rep had agreed to have completed for us and what Mr. Lipham and his crew had been expecting to complete. Fortunately for us, Mr. Lipham and crew have been great to work with and, despite running way over their expected finish date, they’ve been knocking out much of the finish work on the outside that they were not expecting to have to do.

They have spent the past two days working on the roof and porch trim, running more electric, starting the steps between the first and second floor and figuring out where all the railings need to be placed.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day 19 – 23…framing the second floor, sealing the log ends and building the roof system

By Monday of this week the tongue and groove had been replaced on the second floor.  Thankfully, the crew had been able to pull it up and put it back down without damaging the boards!

Once the floor was put back into place, they moved onto framing the bedrooms and guest bath on the second floor.

Much of the week was spent working on the five layered roof system.  First to go down was the tongue and groove that makes up the ceilings of the second floor and great room, over which was placed the first layer of roofing felt.  That was followed by the layer of super thick insulation, followed by a layer of OSB and finally another layer of roofing felt. We’ll eventually have a tin roof placed on top of all of that.

With much of the major building complete, they began to work on smaller details.

We had heard from a few different sources, one of which was the Perma Chink rep at the Log and Home show, that log sealant should be used on the log ends…Mr. Lipham had never heard of such a thing nor seen anyone else seal their log ends in the 14 years that he’s been building log homes. Pretty sure he thought we were crazy for doing it, but we did it non the less. The log sealant turned out to be the consistency of Elmer’s glue and smelled remarkably like it as well.  Actually, it ended up drying somewhat like Elmer’s as well.  We’re now pretty well convinced that’s all it is.

Though Dave had stayed down at the work site till dusk several times, I had yet to be down there long enough to see what the sunset would look like from our deck.  We had arrived so late the day we went down to seal the logs that I finally had my chance as we were just finishing when the sun began to set.

We are still completely amazed that in just over three weeks we’ve gone from having just a foundation to being almost completely dried in! Although the first estimate was to be done in 16 days, Mr. Lipman’s new goal is to be finished tomorrow which will be 25 days…only 9 day over….stay tuned to see if they meet that goal.  😉

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , , | Leave a comment

day 18…windows, we have windows!!!

First thing on today’s agenda was hammering down hundreds of metal plates over the wires along the second floor so the tongue and groove flooring could be put back in place. Dave pitched in and helped so that it would move along a little faster…this time, unlike the caulking incident, Miguel seemed happy for the help.  🙂

Once the wiring issue was taken care of, it was onto the windows!

Max had come down with us and spent the first half of the morning working on homework. When it was time to clean up, we all pitched in…there was sawdust and wood scraps everywhere so I picked up the broom while Dave showed Max how to blow off the sawdust with a leaf blower. He was supper psyched when Mr. Lipham let him switch out our puny leaf blower for his giant one.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day 15 and 16….t & g ceilings and…this is why wiring a log home is different than your average house

We both missed going down last Thursday to check out the progress on the cabin and were completely astounded when we arrived Friday at the site of the great room ceiling! We’d seen countless photos of the interior of many a two story great room in our Log Home magazines but were still unprepared for what we walked into that morning…it was simply breathtaking.

Most of the crew worked outside putting up more log siding, finishing off dormers and laying down more roofing felt. They’d been working particularly hard so we thought we’d bring in pizza for lunch.

Although some of the first floor wiring had been done, we hadn’t witnessed first hand just quite how difficult some of the wiring would be. As I had mentioned in a previous post, all of the wire has to be hidden in window and door frames, across the first floor rafters and under the second floor t & g, and also up over the roof for the second floor ceiling lights and fans .  This requires drilling through the heavy 12″ timbers and running over half a mile of wire, all to be connected down in the basement.(I’d somehow turned off the autofocus on my camera so some of the photos are slightly out of focus. Boo.)

Andy had to leave at the end of the day to drive back to Alabama and I must admit, we were sad to see him go.  He has added such a positive energy to the work site, constantly laughing, helping everyone out and keeping the entire atmosphere upbeat.  Before he left, he told us not to hesitate to call if we need help while we’re finishing the inside of the cabin…we may just have to “create” a problem so we can call him to come help us out!  ;-D

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , , | Leave a comment

day 14…closing in the front dormers, framing windows and placing more t & g on the roof

Another unusually chilly and windy November morning on Colemans Lake. I spent most of my time sitting by one of the two fires we had going!

The crew continued to put down the tongue and groove on the roof and to close in the front dormers today.

While most of the crew worked up on the roof, foreman, José, and our multi-talented electrician, Andy, worked on building the frames for the wall of windows in the great room while Dave and Mr. Lipham discussed our ideas for our fireplace.

After helping with the window framing, Andy does a little more wiring while Carlos, Nelson and Mateo start placing the tongue and groove roof around back.

 

 

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , , | Leave a comment

day 10 & 11…bleaching the logs and adding the log siding on the second floor

Saturday morning Dave went down ahead of me so that he could be there when our stain was delivered.  We had initially planned to do the staining ourselves but when we saw first hand just how high the second story is on the back of the cabin where the double wall of windows will be, the more daunting it seemed.  We made the command decision the day before that we would have our Battle Creek crew go ahead and do it while they were here, given that they had all the necessary equipment and knew what they were doing.  However, this put us in a time crunch as the forecast for the next week was freezing temperatures and snow flurries.  Mr. Lipham said that if we could get the stain overnighted, they could start staining by Sunday and be finished before the icy temps set in.  After much back and forth, it was decided that the cheapest way to have it overnighted was to pay a driver to drive it down from Tennessee.  We also had to make a quick decision as to which color to choose. After attending the Permachink talk at the Chantilly Log and Timber show, we decided to go with their Lifeline Ultra-7 line as it had the best reviews and only requires one coat.  This left us with fewer choices, none that really jumped out at us.  In the end, after talking with Mr. Lipham about it and listening to his advice, we went with the Oak.

The stain arrived as scheduled and the crew went to town trying to get everything done on the outside in order to start staining on Sunday.

By Sunday, the log siding was ready to be placed.  The full timber logs make up the first floor walls as well as the double story wall around the windows in the great room, while the two second story side walls are framed, covered with OSB and then covered with the log siding.  Once it is finished and stained, they will look like logs as well.  Once the logs and siding are finished, caulking is placed, if desired, in areas where there are slight gaps.  While the crew was on lunch break, Dave decided he would pick up a caulking gun and start doing a little caulking himself.  Clearly none of the crew members know that Dave has done his share of caulking in the past. I heard a quiet muttering in Spanish behind me as one of the crew members tried to catch Miguel’s attention to let him know what was going on.  Next thing we knew, several heads appeared around the corner of the front porch as everyone came to see what was going on.  Miguel promptly came over and removed the caulking gun from Dave and proceeded to do it himself.  Lunch break over!

By the time the caulking had been finished, the wind had really picked up and the command decision was made to call it a day and wait till Monday morning to start staining.  Just as well since ideally the caulk needed to set for 24 hours before applying stain.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , | 3 Comments

day 8 & 9… in which Dave finally gets to do a little work

Dave and I both missed going down to watch the building progress last Thursday so got around bright and early Friday morning to head down with the plan to hang out all day.  Mom had been wanting to check out the progress as well as she hadn’t been to the lake since just after we purchased the property, so she made plans to come along with us. Building had slowed down a bit the past couple of days as José had to take a couple of the guys off to  finish another project that they had previously started. Andy had also returned to home for a few days so we were down to just half the original crew.  When we arrived, a few of the men were working on laying the back deck, while the others were around front setting the heavy timber porch frame over the front door.

If you know Dave at all. you know that he has been dying to jump in and do a little work himself.  He had been fretting for months over the fact that the deck and porch posts were going to be placed directly onto the concrete pads that had been poured and finally decided that he was going to improve upon that plan.  He drilled into each concrete block, epoxied a large metal bolt into each hole, and attached metal hangers on which to place the posts upon.

I know I’ve posted plenty of photos of the lake and dam, but I just couldn’t help taking a few more…it’s just so beautiful. I will leave you with a few more shots…

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , | Leave a comment

day 7…back on track

Having recovered from the previous day’s setback, our Battle Creek crew was back in action early Wednesday morning.  We hadn’t stayed long enough Tuesday to see the three newly replaced beams running the length of the first floor ceiling, so were thrilled to see how awesome they looked.  The two 12″ x 6″ beams on either end that will be supporting the second floor bedrooms are lamibeams, while the middle beam is solid timber.

With the first floor framing complete and the temporary flooring back down on the second floor, with the help of one of the other crew members, Andy was able to begin running the electrical wire to the two floors.  As they are working with log walls that will remain exposed, the wires need to be run down door frames and across the top of the heavy timbers.  Channels need to be cut into the wood before the tongue and groove ceiling and the flooring goes down…the wire will then run along the channels and be hidden.

Outside several of the crew members were going to town on the front porch…

while others continued framing the roof and dormers along the front of the cabin.

Around back we had yet another group working on framing the roof over the great room. A slight dilemma occurred when the heavy timber peak was put in place and it wasn’t level. After a brief discussion, the solution was offered by Andy, our electrician- Lift the A-frame and place two 2″ x 8″ s on top of the log wall to bring in up to level.  Yep, definitely thinking Andy knows a little more about building log homes than just running the wire! I think I forgot to mention in the last post that it was Andy who discovered the lamibeam/timber mixup the previous day.

After talking to Andy a bit, he told me that he has built log homes before and knows how to do a bit of everything that goes into building a house.  However, as much as he loves running wire and building, he only does it on the side.  His real life occupation is owner of a Sears store in Alabama.  When I mentioned this to Dave, he replied, “hmmm, Mr. Lipham has a son who owns a Sears store.  You don’t suppose…..”  So it turns out that Andy is actually Mr. Lipham’s son and has been building log homes with him for 10 years.  That explains alot!  And what a great team they make…we are fortunate to have them both on our team.

By the time we pulled out, the cabin had taken on quite a transformation from the previous day and once again, we were completely amazed and thoroughly impressed be everyone involved in making it so.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , | Leave a comment

day 6…OOPS!

Although we had initially arranged for our mechanicals contractor, Todd Hawkes, to line up an electrician, with the sudden unexpected arrival of the Battle Creek building crew, we had to go to plan B. We needed to begin the wiring as soon as possible as it has to be done while the log cabin is being built, unlike a standard home construction, where you can run the wire after the framing is complete. Fortunately, Mr. Lipham had an electrician that he’s worked with previously who happened to be available and was willing to drive up from Alabama to help us out.  Within moments of meeting Andy, we were thrilled to have him join our team and it soon became clear that he knew a little more about building log homes than just running wire.

The wiring having been started and framing of the rafters done, things were running pretty smoothly until, in the course of inventorying the timber that was still left, three large lamibeams were discovered. Since all the heavy timber beams were in place at this point, the crew went back to review the blue prints to figure out where they should have been. It was at this point that it was discovered that there were two sets of plans on site that were being used. The difference between the two, one being an engineer set, showing lamibeams in place of the heavy timber beams that run the length of both the ceiling of the first floor as well as the roof peak. Since it was the engineered plans that had been submitted for the building permit, that meant in order for us to pass inspection the solid timbers that were already in place would have to be switched out for the lamibeams which are slightly stronger.

While the crew broke for lunch, Dave, Mr. Lipham, and José discussed what needed to be done.

A bit of a set back to say the least, but Mr. Lipham, José and our fabulous crew took it in stride and, their main concern being to do things right, wasted no time in switching them out. That meant un-building much of the roof and first floor ceiling structure that was already in place.

Having successfully replaced the timbers on the roof peak, the crew switched their attention inside to the three beams that run the length of the first floor ceiling.

Although it put the crew a full day behind, we were all relieved that they were able to successfully replace all the beams with relatively few complications.  Hopefully that will be the last little hiccup during the building process!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment