Having completed the outer walls the previous day, the crew moved their attention to the inside and began framing the first floor.
- rafters over the front section of the cabin
- heavy timbers that run the length of the first floor ceiling
- lifting the OSB board for the second floor
- looking up into the dining area and kitchen
- looking up into the master bedroom
- looking in the front door
- looking into the kitchen from the entrance way
- standing in the kitchen looking out at the great room
- stairwell and master bath
- me, standing in the dining area
- dining area- french doors will go out onto the deck
- Dave, standing in the kitchen
- the kitchen
- looking out the front from the great room- kitchen is on the left
- Dave, José and Mr. Lipman discuss whether or not we can remove that short wall on the right as it blocks some of the view from the dining area
- love the heavy timbers!
- Miguel on the right, discusses the blue prints with one of the crew
- Foreman, José, brings over more framing boards
- dining area and great room again
- stairs to the basement
- 11/10/13- laundry room and half bath on the left
- looking from the master bedroom out into the great room
- master bath and closet
- master bedroom- french doors will lead out onto the deck