Posts Tagged With: J. M. Log Craftsman

day 10 & 11…bleaching the logs and adding the log siding on the second floor

Saturday morning Dave went down ahead of me so that he could be there when our stain was delivered.  We had initially planned to do the staining ourselves but when we saw first hand just how high the second story is on the back of the cabin where the double wall of windows will be, the more daunting it seemed.  We made the command decision the day before that we would have our Battle Creek crew go ahead and do it while they were here, given that they had all the necessary equipment and knew what they were doing.  However, this put us in a time crunch as the forecast for the next week was freezing temperatures and snow flurries.  Mr. Lipham said that if we could get the stain overnighted, they could start staining by Sunday and be finished before the icy temps set in.  After much back and forth, it was decided that the cheapest way to have it overnighted was to pay a driver to drive it down from Tennessee.  We also had to make a quick decision as to which color to choose. After attending the Permachink talk at the Chantilly Log and Timber show, we decided to go with their Lifeline Ultra-7 line as it had the best reviews and only requires one coat.  This left us with fewer choices, none that really jumped out at us.  In the end, after talking with Mr. Lipham about it and listening to his advice, we went with the Oak.

The stain arrived as scheduled and the crew went to town trying to get everything done on the outside in order to start staining on Sunday.

By Sunday, the log siding was ready to be placed.  The full timber logs make up the first floor walls as well as the double story wall around the windows in the great room, while the two second story side walls are framed, covered with OSB and then covered with the log siding.  Once it is finished and stained, they will look like logs as well.  Once the logs and siding are finished, caulking is placed, if desired, in areas where there are slight gaps.  While the crew was on lunch break, Dave decided he would pick up a caulking gun and start doing a little caulking himself.  Clearly none of the crew members know that Dave has done his share of caulking in the past. I heard a quiet muttering in Spanish behind me as one of the crew members tried to catch Miguel’s attention to let him know what was going on.  Next thing we knew, several heads appeared around the corner of the front porch as everyone came to see what was going on.  Miguel promptly came over and removed the caulking gun from Dave and proceeded to do it himself.  Lunch break over!

By the time the caulking had been finished, the wind had really picked up and the command decision was made to call it a day and wait till Monday morning to start staining.  Just as well since ideally the caulk needed to set for 24 hours before applying stain.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , | 3 Comments

day 7…back on track

Having recovered from the previous day’s setback, our Battle Creek crew was back in action early Wednesday morning.  We hadn’t stayed long enough Tuesday to see the three newly replaced beams running the length of the first floor ceiling, so were thrilled to see how awesome they looked.  The two 12″ x 6″ beams on either end that will be supporting the second floor bedrooms are lamibeams, while the middle beam is solid timber.

With the first floor framing complete and the temporary flooring back down on the second floor, with the help of one of the other crew members, Andy was able to begin running the electrical wire to the two floors.  As they are working with log walls that will remain exposed, the wires need to be run down door frames and across the top of the heavy timbers.  Channels need to be cut into the wood before the tongue and groove ceiling and the flooring goes down…the wire will then run along the channels and be hidden.

Outside several of the crew members were going to town on the front porch…

while others continued framing the roof and dormers along the front of the cabin.

Around back we had yet another group working on framing the roof over the great room. A slight dilemma occurred when the heavy timber peak was put in place and it wasn’t level. After a brief discussion, the solution was offered by Andy, our electrician- Lift the A-frame and place two 2″ x 8″ s on top of the log wall to bring in up to level.  Yep, definitely thinking Andy knows a little more about building log homes than just running the wire! I think I forgot to mention in the last post that it was Andy who discovered the lamibeam/timber mixup the previous day.

After talking to Andy a bit, he told me that he has built log homes before and knows how to do a bit of everything that goes into building a house.  However, as much as he loves running wire and building, he only does it on the side.  His real life occupation is owner of a Sears store in Alabama.  When I mentioned this to Dave, he replied, “hmmm, Mr. Lipham has a son who owns a Sears store.  You don’t suppose…..”  So it turns out that Andy is actually Mr. Lipham’s son and has been building log homes with him for 10 years.  That explains alot!  And what a great team they make…we are fortunate to have them both on our team.

By the time we pulled out, the cabin had taken on quite a transformation from the previous day and once again, we were completely amazed and thoroughly impressed be everyone involved in making it so.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , | Leave a comment

day 6…OOPS!

Although we had initially arranged for our mechanicals contractor, Todd Hawkes, to line up an electrician, with the sudden unexpected arrival of the Battle Creek building crew, we had to go to plan B. We needed to begin the wiring as soon as possible as it has to be done while the log cabin is being built, unlike a standard home construction, where you can run the wire after the framing is complete. Fortunately, Mr. Lipham had an electrician that he’s worked with previously who happened to be available and was willing to drive up from Alabama to help us out.  Within moments of meeting Andy, we were thrilled to have him join our team and it soon became clear that he knew a little more about building log homes than just running wire.

The wiring having been started and framing of the rafters done, things were running pretty smoothly until, in the course of inventorying the timber that was still left, three large lamibeams were discovered. Since all the heavy timber beams were in place at this point, the crew went back to review the blue prints to figure out where they should have been. It was at this point that it was discovered that there were two sets of plans on site that were being used. The difference between the two, one being an engineer set, showing lamibeams in place of the heavy timber beams that run the length of both the ceiling of the first floor as well as the roof peak. Since it was the engineered plans that had been submitted for the building permit, that meant in order for us to pass inspection the solid timbers that were already in place would have to be switched out for the lamibeams which are slightly stronger.

While the crew broke for lunch, Dave, Mr. Lipham, and José discussed what needed to be done.

A bit of a set back to say the least, but Mr. Lipham, José and our fabulous crew took it in stride and, their main concern being to do things right, wasted no time in switching them out. That meant un-building much of the roof and first floor ceiling structure that was already in place.

Having successfully replaced the timbers on the roof peak, the crew switched their attention inside to the three beams that run the length of the first floor ceiling.

Although it put the crew a full day behind, we were all relieved that they were able to successfully replace all the beams with relatively few complications.  Hopefully that will be the last little hiccup during the building process!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day five…framing the first floor

Having completed the outer walls the previous day, the crew moved their attention to the inside and began framing the first floor.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day four…continuing to stack the logs

The crew wasted no time and was back to work bright and early Sunday morning.  Things were already in full swing by the time we arrived that morning.

We’d previously made plans to meet up with Bernard’s friends, Michael and Nona while he was down visiting, not knowing that we would be building that weekend.  Thankfully, they were kind enough to alter our Sunday brunch plan and instead drive down from Richmond to check out the cabin and visit for awhile at the lake so we wouldn’t miss out on watching the build. Michael has plans to build a log cabin at some point on his family property so he was thrilled to get the chance to see the work in progress.

We really couldn’t believe the amount of progress they had made in four days and decided to show our appreciation for their hard work by cooking lunch for the whole crew.

After the crew ate their fill, it was back to work.

By the time we left, they had almost completed the stacking the logs!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , | Leave a comment

the moment we’ve all been waiting for…

Day 2 & 3

After a great start on Thursday, the progress on Friday was slowed down due to the weather.  As the forecast had called for rain all day, Dave and I opted not to go down, thinking we wouldn’t be missing anything.  However, we were were mistaken. The crew had been able to finish the sub-flooring before the rain started so once the skies opened up, they went below and built the stairwell leading from the first floor to the basement. Fortunately, there were periodic breaks in the rain and they were then able to work up top and prep for the stacking of the logs.  George Lewis returned in the morning, before the rain came, and was able to do the back fill along the foundation so the crew no longer had to use a catwalk to get to the cabin. By the time Dave arrived Saturday morning, they had already stacked three rows!

DSC_0571

Dave arrived Saturday morning to find that they had already begun stacking the logs!

Though off to a great start, they hadn’t gotten far before discovering that some of the logs had not been notched properly. When put in place, there was a small gap between the logs that shouldn’t have been there.  The only solution was to hand cut each improperly cut notch so that the logs would lay flush. A little bit of a set back, but once the logs were notched properly it was smooth sailing the rest of the day.

A good friend of mine, Bernard Casey, had come down for a weekend visit so we were anxious to show him the place…by the time he and I arrived at noon along with Max, the place had really started to look like a log cabin!

By the time we left on the third day, we were absolutely amazed at the progress that had been made!

Wow, this is going to be a fabulous view!

DSC_0600

looking out at the lake from where the wall of windows will be

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | 3 Comments

Create a free website or blog at WordPress.com.