Posts Tagged With: Coleman Lake Cabin

winter hits Colemans Lake…what a perfect time to test out the fireplace!

This week’s snow east coast snow storm and frigid temperatures did not leave Colemans Lake untouched. When we arrived Sunday morning, we found snow still covering much of the ground and the lake and dam area filled with a lovely array of ice sculptures.

We spent the morning finishing the inside of the fireplace and were finally able to test it out. We couldn’t have picked a more perfect day for our first fire!

Categories: Follow the adventure as we build our log cabin | Tags: , , | Leave a comment

in which we finally build front porch stairs…no more entering by ladder, yea!

Until this past weekend, in order to enter the cabin through the front door, we’ve had to use a ladder to climb up onto the front porch. Not a big deal but a bit tiresome when you’re carrying tools and various supplies in and out of the place. Finally, after three months of doing just that, we took on the task of building front porch stairs.

Once again, when we arrived at the lake, the temperature was below freezing and the ground was covered in inch and a half ice crystals that seem to grow upwards out of the ground every night.  Much fun to step on as they create a very satisfying crunch as you walk…not so much fun once the sun melts them as the melted ice turns the entire work site into a giant pit of mud.  Dave hates mud.  It makes him grumpy. Especially when his tools fall into it.

Dave wasted no time in setting up his work station and getting to the task at hand. After digging two holes and placing cement blocks in each to support the stairs, using heavy timber and careful to stay out of the mud, he whipped us out a set of stairs.

With only a short period of daylight left, we decided to wait and finish the hand rails next week and to move on to finishing the trim around the doors in the back. While working on the trim around the master bedroom door, I looked up to discover a visitor checking out our bedroom…stairs up less than a day and we already had a guest come to check them out! It was an adorable little black and brown beagle mix, who, although very curious, was unfortunately way too skittish to let me come near it.  Note to self, bring dog treats next weekend.  🙂

And last on the list of tasks for the day, was to find a log the right size to use for making supports for the fire place mantel.

IMG_5816

Dave uses the chainsaw to cut two piece of log to make supports for the fireplace mantel

Categories: Follow the adventure as we build our log cabin | Tags: , , , | Leave a comment

framing up the fireplace wall and hearth

Another crazy weekend, weather wise.  Saturday started with heavy fog that was just beginning to lift as we got to the lake.  It was already warm and humid out when we arrived and supposed to get up into the 70s, but not so inside the cabin.  As soon as we opened the front door, we were hit by an icy draft as the cold air from inside the cabin rushed out.

Undeterred from the icy inside temps, Dave started up the generator, turned on the heater, and went to town building the fireplace wall.

And, incase you were wondering what our place looks like from above, Todd Hawkes just sent us this photo… Thanks Todd!!!

Image

The Coleman Cabin and Colemans Lake as seen from above

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , | Leave a comment

finishing the dormers, closing in the chimney, putting in the basement windows and starting the roof

Okay, so I got a little behind with my bloggin’ over the holidays…bear with me, a lot has been happening so this is going to be a long one!

When the JM Logcraftsman crew left on Thanksgiving Day, there were still a few things left unfinished.  They had run out of log siding for the second time so were unable to finish one of the dormers and, therefore, unable to stain them as well. In addition, the original basement windows that had been delivered with the rest of the kit ended up being the wrong size so new windows had to be ordered but had not yet arrived before the crew left. The wiring on the second floor was also incomplete and that which had been done was done incorrectly as, once Andy left, it had been left to be completed by one of the crew members who was unfamiliar with wiring. The original plan was for Mr. Lipham, Andy and one other crew member to return the first week in December to finish these three things, as well as to finish staining the outside of the cabin. The first week turned into the second week, which then turned into no communication from anyone as to when they might be back.

Granted, this was all during the holiday season and Mr. Lipham had also taken on building another cabin in Arkansas so I have no doubt that he and Andy both were being pulled in all different directions.  Having said that, regardless of what is happening on their end, the fact of the matter is that our place is still unfinished and we need to move forward.  Our local contractor, Todd Hawkes, had lined up people to start the plumbing, the HVAC and the roof and they were all ready to get started. Unfortunately, the dormers in particular had to be completed before the roof could be put on so, still hearing no date for Mr. Lipham to return, Dave arranged with Battle Creek to have the log siding and basement windows to be delivered directly to us so we could move forward.

Finishing the dormers

Although the log siding had yet to arrive, we went down the weekend before Christmas to start staining the dormers in the front so that the roofers could at least start on that side.  Dave also wanted to change out the trim on the arched window over the entrance as, on closer inspection, we realized it was less than spectacular to say the least.  By the time we finished the front dormers and had stained what we could in the back, the siding arrived so the following weekend we were able to get that up and finish staining the last dormer so the roofers could begin.

Putting in the basement windows

Meanwhile, the new basement windows had also arrived.  Thankfully, they proved to be relatively simple to put in and made a huge difference in the amount of light in the basement once they were in.

Putting in the fireplace/chimney insert

One of our next goals is to get the fireplace in working order so we can warm up the inside of the cabin to make working on the inside a little more pleasant during these coming winter months. Over the past few weekends we’ve been making progress and were finally successful this past weekend in getting the last of the chimney inserts in place and closing up the chimney.

HVAC & Plumbing & roof

While we’ve been busy with our projects on the weekends, there has been much going on during the week as well.

putting in the knee walls

Initially, we wanted to keep the tongue and groove of the roof exposed on the front side of the upstairs bedrooms and build knee walls on the back for storage. However, once the air vents and pipes were placed, we had to rethink which walls we were going to keep exposed on the second floor.

A visit from Dave’s folks

Although Dave’s parents have been avid blog followers, they haven’t had a chance to get down here to check the place out since construction began.  Fortunately, they were able to come down and spend Christmas with us and we brought them down on Boxing day to take a look around.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , | Leave a comment

closing in the deck…

Though our original plan was to have stairs coming off of the back deck on either side, after giving that idea more consideration, we decided we’d feel more secure having the entire deck closed in. Given that our bedroom opens out onto the deck, and the fact that there are bears and bobcats in the area, we thought we’d feel more more comfortable sleeping there knowing that no unwanted visitors would be coming up onto the deck at night. However, as our blue prints showed an opening where the stairs were meant to be, our supply kit didn’t contain enough rails to close the deck in and the building crew had to leave the deck open on each end. Fortunately, there was enough lumber remaining after they finished up, as well as plenty of extra posts, that Dave was able to make the rails himself and we were able to close in the deck with no problem.

We were also very happy this week to receive a message from Todd Hawkes that his plumber had made it out to the cabin and began roughing in the plumbing.  Hooray, we’re that much closer to having indoor plumbing!!!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , | Leave a comment

putting on the door knobs during the ice storm…good times….

And what did we do during the ice storm last Sunday? Drove down to the lake to put door knobs and locks on our cabin doors.  Yep, freezing rain, 29 degrees inside and out,  and only a puny little heater, hooked up to the generator, that barely put out any heat. Not sure how Dave managed to work with no gloves or coat as I was bundled up in my heavy parka with snow gloves on, standing in front of the little heater, and had numb fingers and toes within the first hour. We were met with one issue after another- having to re-drill holes to match the knobs and bolts, losing the teeny, tiny screw that held the handle to the rest of the fixture for the front door, and finding that the downstairs french doors weren’t hung straight so the predrilled holes for the door handles and strike plates were so far off that they couldn’t be adjusted to fit. It was a rather frustrating day but we were at least able to successfully get the locks and knobs on the upstairs doors and the side door in the basement.

Categories: Follow the adventure as we build our log cabin | Tags: , , | 1 Comment

christening the cabin…

27 years ago, while living in Zimbabwe, my dad took the old French tradition of Sabrage and altered it by using a large Ethiopian Danakil knife to open a bottle of champagne, rather than a saber.  It has become a family tradition ever since, although, since we don’t all own Danakil knives, we have found that a machete works just as well!  We never miss an opportunity to carry on the tradition, so in true form, we all drove down to the cabin the day after Thanksgiving to give our new place a true Richardson style christening! My brother Jason generally gets the honor of opening the bottle when we’re all together, mostly because he’s had the most practice. 😉

“There are many stories about this tradition. One of the more spirited tales is that of Madame Cliquot, who had inherited her husband’s small Champagne house at the age of 27. She used to entertain Napoleon’s officers in her vineyard, and as they rode off in the early morning with their complimentary bottle of Champagne, they would open it with their sabre to impress the rich young widow.” (http://en.wikipedia.org/wiki/Sabrage)

Categories: Fun times at Colemans Lake | Tags: , , , | Leave a comment

day 26-29….and they’re done…

Day 26

It was not even remotely a surprise to Dave and I when, at the end of the day last Monday, the crew was still not finished. However, they had completed the stairs to the second second floor (excellent job José!), attached the front porch rails, put in the fixed widows in the great room, as well as the heavy detail on the roof trim. Dave stayed long after the sun had set and they were still working on laying the last layer of roof felt, in the dark, using their iPhones for light!  Heavy rain was due to set in the following day so it was imperative that they get the felt down before they quit for the night.

Day 27

I drove down Tuesday morning, expecting the crew to be finishing up and leaving that afternoon, and I wanted the opportunity to say goodbye and to thank everyone for all their hard work.  The rain had already begun and there was a bustle of activity inside and outside when I arrived. It seemed clear to me as soon as I arrived that there was still way too much left undone for them to really be leaving that afternoon. However, I knew that even if José and his crew didn’t leave, Mr. Lipham still needed to leave by the end of the day in order to get home to his family in Tennessee in time for Thanksgiving. Shortly after I arrived, it was discovered that they were 150′ short of roof flashing and asked if I’d run up to Home Depot to pick some up.  Not a huge deal, but the closest Home Depot is thirty minutes back in the direction I’d just driven from. By the time I drove up there, bought the flashing and drove back to the work sight, I knew I’d have to turn around and leave as I had to get home to start prepping for our own Thanksgiving festivities. So much for my thoughts of hanging out to get a group shot of the guys and to say a formal farewell before they wrapped things up and pulled away. There was such a storm of activity inside when I got back, as the crew worked to get things finished, that I felt I was in the way, so, I just snapped a couple of photos, expressed my thanks to Mr. Lipham, wished him a Happy Thanksgiving and off I went in the rain.

Dave went down later that afternoon, after I left, and was able to get the guys to pause for a moment to snap a group shot of the guys on the front porch with his iPhone shortly after he arrived. (You can see in the photo that the rain was pretty heavy at this point.) Regrettably, I had chosen not to leave my camera down there for him to use when I left, so the photo was not the great shot I had hoped for. Still, I’m glad he took it as it was better that not having taken one at all.

IMG_2311

The Coleman Cabin building crew! From left to right- Mateo, Raymond, Mr. Lipham, José, Talon, Carlos, Nelson and Miguel

As he left Tuesday evening, they were still working on putting up the railing on the deck, again in the dark, this time using a flashlight that he had happened to bring along. Mr. Lipham did go ahead and take off so he could get home in time for the holiday leaving José and his J. M. Log Craftsman crew behind to finish.

Day 28-29

Dave went back down for a short time Wednesday to find them working away diligently in the heavy, cold rain, pausing every now and then to try and dry their coats by the fire.  They worked through the day Wednesday and finally finished on Thanksgiving day.  Needless to say we were not there to witness them wrap things up and to wish them well as they drove away. Such an anticlimactic ending to the dry in phase of this building process.  Mr. Lipham and Andy will be back in a few weeks to finish up the wiring and staining and to put in the basement windows that had to be reordered as the ones that had been sent did not fit properly.

We went down after Thanksgiving to check things out and, as we walked through the place taking in all of the details, we couldn’t have been more pleased.  It was such a great experience dealing with Mr. Lipham, José and the rest of the J. M. Log Craftsman team ( http://www.jmlogcraftsman.com/ ) and we can’t even begin to express our gratitude and appreciation for all of the effort that they put in to building our home.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | 2 Comments

day 24 and 25…they’re still heeere

We had been back and forth as to whether we should have a full masonry fireplace built or put in a more efficient wood burning insert.  After much research on Dave’s part, we decided on an insert, as long as we could find one that would still give us the look of a massive wood burning fireplace that we feel every log cabin needs.  After finding just the right one, Dave, after more research, decided he would be able to install it himself and went ahead and placed the order. Expecting it to arrive after the crew had left, he had it delivered it to our Midlothian residence, hoping it would be in smaller pieces as the total weight would be 600lbs.  We were rather surprised when in showed up two days later, on two separate pallets, one of which we were able to break into smaller sections to get into my van, the other, the insert itself, in one complete piece and impossible for Dave and Max to lift even with a hand truck.  I’d like to give a shout out to our awesome neighbors, Brian and Jason Astroth, and Bill Durow, who came over to lend Dave a hand in hoisting the massive thing onto our trailer so we could haul it down the the cabin…thanks guys we owe you one!!! Once down at the site, it took all six crew members plus Mr. Lipham and Dave, to heave it up the four feet onto the front porch and then bring it into the great room.  Thank goodness they were still here when it arrived! Unfortunately, I was sick that day so there are no photos of the whole production. 😦

It came as no surprise to Dave and I when the end of today arrived and our Battle Creek crew had yet to wrap things up as we had thought it incredibly optimistic of Mr. Lipham when he set today as the new finish date.  They had ended up losing two crew members durning the course of the time that they have been here which has slowed down the progress somewhat and, in addition, there was a discrepancy between what the Battle Creek rep had agreed to have completed for us and what Mr. Lipham and his crew had been expecting to complete. Fortunately for us, Mr. Lipham and crew have been great to work with and, despite running way over their expected finish date, they’ve been knocking out much of the finish work on the outside that they were not expecting to have to do.

They have spent the past two days working on the roof and porch trim, running more electric, starting the steps between the first and second floor and figuring out where all the railings need to be placed.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day 19 – 23…framing the second floor, sealing the log ends and building the roof system

By Monday of this week the tongue and groove had been replaced on the second floor.  Thankfully, the crew had been able to pull it up and put it back down without damaging the boards!

Once the floor was put back into place, they moved onto framing the bedrooms and guest bath on the second floor.

Much of the week was spent working on the five layered roof system.  First to go down was the tongue and groove that makes up the ceilings of the second floor and great room, over which was placed the first layer of roofing felt.  That was followed by the layer of super thick insulation, followed by a layer of OSB and finally another layer of roofing felt. We’ll eventually have a tin roof placed on top of all of that.

With much of the major building complete, they began to work on smaller details.

We had heard from a few different sources, one of which was the Perma Chink rep at the Log and Home show, that log sealant should be used on the log ends…Mr. Lipham had never heard of such a thing nor seen anyone else seal their log ends in the 14 years that he’s been building log homes. Pretty sure he thought we were crazy for doing it, but we did it non the less. The log sealant turned out to be the consistency of Elmer’s glue and smelled remarkably like it as well.  Actually, it ended up drying somewhat like Elmer’s as well.  We’re now pretty well convinced that’s all it is.

Though Dave had stayed down at the work site till dusk several times, I had yet to be down there long enough to see what the sunset would look like from our deck.  We had arrived so late the day we went down to seal the logs that I finally had my chance as we were just finishing when the sun began to set.

We are still completely amazed that in just over three weeks we’ve gone from having just a foundation to being almost completely dried in! Although the first estimate was to be done in 16 days, Mr. Lipman’s new goal is to be finished tomorrow which will be 25 days…only 9 day over….stay tuned to see if they meet that goal.  😉

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , , | Leave a comment