Posts Tagged With: Coleman Lake Cabin

day five…framing the first floor

Having completed the outer walls the previous day, the crew moved their attention to the inside and began framing the first floor.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

day four…continuing to stack the logs

The crew wasted no time and was back to work bright and early Sunday morning.  Things were already in full swing by the time we arrived that morning.

We’d previously made plans to meet up with Bernard’s friends, Michael and Nona while he was down visiting, not knowing that we would be building that weekend.  Thankfully, they were kind enough to alter our Sunday brunch plan and instead drive down from Richmond to check out the cabin and visit for awhile at the lake so we wouldn’t miss out on watching the build. Michael has plans to build a log cabin at some point on his family property so he was thrilled to get the chance to see the work in progress.

We really couldn’t believe the amount of progress they had made in four days and decided to show our appreciation for their hard work by cooking lunch for the whole crew.

After the crew ate their fill, it was back to work.

By the time we left, they had almost completed the stacking the logs!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , | Leave a comment

the moment we’ve all been waiting for…

Day 2 & 3

After a great start on Thursday, the progress on Friday was slowed down due to the weather.  As the forecast had called for rain all day, Dave and I opted not to go down, thinking we wouldn’t be missing anything.  However, we were were mistaken. The crew had been able to finish the sub-flooring before the rain started so once the skies opened up, they went below and built the stairwell leading from the first floor to the basement. Fortunately, there were periodic breaks in the rain and they were then able to work up top and prep for the stacking of the logs.  George Lewis returned in the morning, before the rain came, and was able to do the back fill along the foundation so the crew no longer had to use a catwalk to get to the cabin. By the time Dave arrived Saturday morning, they had already stacked three rows!

DSC_0571

Dave arrived Saturday morning to find that they had already begun stacking the logs!

Though off to a great start, they hadn’t gotten far before discovering that some of the logs had not been notched properly. When put in place, there was a small gap between the logs that shouldn’t have been there.  The only solution was to hand cut each improperly cut notch so that the logs would lay flush. A little bit of a set back, but once the logs were notched properly it was smooth sailing the rest of the day.

A good friend of mine, Bernard Casey, had come down for a weekend visit so we were anxious to show him the place…by the time he and I arrived at noon along with Max, the place had really started to look like a log cabin!

By the time we left on the third day, we were absolutely amazed at the progress that had been made!

Wow, this is going to be a fabulous view!

DSC_0600

looking out at the lake from where the wall of windows will be

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | 3 Comments

enter Kenneth Lipham and his band of log craftsmen…

Having resigned ourselves to the fact that nothing more was going to happen with the cabin till November 11, we were rather surprised to get a phone call last Tuesday night from Kenneth Lipham, informing us that he would be arriving in town Wednesday morning, followed shortly thereafter by his building crew, and that they would begin construction on our cabin at dawn Thursday morning.  We were completely taken off guard (to say the least!) but made arrangements to drive down and meet him at the lake Wednesday afternoon.  We arrived to find him already on site along with his furry little sidekick, Bingo.  It seems that, since Battle Creek’s regular building teams were so far behind, they had called in Mr. Lipham and his team, who contract out to several different Log Home companies across the country, to see if he could step in and build our home. After talking with him for two and a half hours, we left with the feeling that we were completely in good hands and actually fortunate that he would be handling our construction rather than the originally planned team. He informed us that his crew would work from dawn till dusk, seven days a week (with a 30 minute break taken on Sundays for a church service),  and that they would be finished in 15 days rather than the five weeks that we had originally been told it would take to have us dried in!!!

IMG_4779

Bingo checks out our floor plan

Day 1

After a brief blessing is said, construction begins!

Though our kit included everything needed to build our cabin from the first floor up,  we are responsible for suppling the support posts for the basement as well as the materials for the stairs leading from the first floor to the basement.  After watching the construction for a couple of hours, Dave and I took off to Home Depot in Petersburg to rent a truck and pick up the supplies the crew would need.

By the end of the first day, the stairwell and the supporting structure for the first floor was complete and the first row of floor boards were in place.

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

much fun at the Log and Timber Home Show

In the midst of a lull in activity at the coleman cabin, we were very happy to drive up to Chantilly, VA to check out the Log and Timber Home Show.  Once there, we were pleased to find exhibits by two of the vendors that we plan to use.  PermaChink stains, whom we plan on purchasing our stain from, not only had an exhibit set up but also a short workshop on staining technique as well.  What did we learn from them?  Mostly that we hope our budget will allow for someone else to do the staining for us!!! We were, however, able to narrow down what type of stain we will be using, as well as the color, at least for the exterior. We’re leaning towards the Cedar http://www.permachink.com/vmchk/lifeline-ultra-7.html for the exterior and though still up in the air about the color choice for the interior, we are leaning towards the Light Natural http://www.permachink.com/wood-stains-and-finishes/lifeline-interior.html.

Also present was Don Jensen of Wood Doors by Don, who we would like to purchase our interior doors from. We had planned on taking the four hour drive to Wytheville, Virginia to check out the doors in person so were thrilled to have been saved from having to make that trip.  After talking with him in length, we were able to decide which door we will be using http://wooddoorsbydon.com/knottypinelog.html …you know, if we can ever get the building crew down to actually build our cabin. (New date for their arrival is Nov 11.)

There were also vendors selling handmade wooden tables and various other pieces of furniture, as well as plenty of wood carvings, antler chandeliers, animal skin chairs and benches.  We plan on making our own table out of logs from our property and I am now completely psyched about trying to do a chainsaw carving of a bear.  Max is sure I won’t be able to, silly boy. Challenge accepted…it’s on. 🙂

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , | Leave a comment

potato canons, hobo pies and pumpkins

A few years back, when we were up visiting my brother and his family, Dave and Jason decided they needed to build a couple of potato canons.  They spent the morning viewing how-to videos, as well as examples of various different potato canon models, on YouTube then headed over to Home Depot to buy their supplies.  By late afternoon each family had their own potato canon and we all went out onto their back deck to test them out. None of us had anticipated just how loud or how far they would shoot! Fortunately, we didn’t take out any windows on the other side of the neighborhood.  As far as we know.

We were hooked from that point on and the firing-of-the-potato-canon has become a tradition at all important family events forever after.  Somehow however, we’ve continuously forgotten to bring it with us every time we’ve gone down to the lake… until this past weekend that is.

Somehow it doesn’t sound nearly as loud when you shoot it in a wide open space as when we have shot it at home!

Photos from Oct 20, 2013

Our fun was cut short when one of the neighbors came out to go fishing. No worries though, we had all had a few chances to see how far across the lake we could shoot, so we packed up the potato canon and ammo and headed up to Waffles Ridge to make Hobo Pies.

Having sufficiently stuffed ourselves, it was time for a little target practice…

After everyone had had their fill of shooting targets, we went back over to the lake for bit.

Having had several hours of fun, it was now time to pack up and head out.  Although we had to say goodbye to the Clarke family, Laura and Jared decided to join us for a late lunch on our way out at our favorite Mexican restaurant, El Caporal.

DSC_0443

I handed the camera over to Max to take a quick photo of Jared, Laura, Dave and I as we share a toast

One more stop before heading home. We had yet to buy our fall pumpkins and the farmers market just happened to be right next to El Caporal….

 

After finding three practically perfect pumpkins, we headed back home, having had another fun-filled day and created many more lasting memories of perfect days spent at the coleman cabin.  Okay, so technically we don’t actually have the completed cabin yet, but still….

Categories: Fun times at Colemans Lake | Tags: , , , | Leave a comment

bringing in the electric

Still no new date for the arrival of our construction crew! In the meantime, however, there are other things that still need to be decided upon, such as, where exactly our power line will run.  There is an existing power line that runs parallel to Colemans Lake Rd, on the opposite site of the road from the lake, which supplies all of the neighboring houses.  Our line will be pulled from this existing line, to a pole that will be placed somewhere on our property on that side of the road, then run across Colemans Lake Rd to a second pole, and from there will run underground to the cabin.  We had our initial meeting with Lacey Palmore, of Southside Electric Cooperative, a few weeks back and had discussed tentatively where that line would run.  As a result of that discussion, we had Todd Hawkes clear the necessary 40′ wide path so it would be ready for the power line as soon as possible.  We were thus a little concerned yesterday, at our second meeting, when Lacey suggested a different path, which would require clearing a completely different section of our woods.  Thankfully, Todd was very adamant about placing the first pole exactly where we had previously discussed and Lacey agreed that she would make it work.  We are finding that, just as we are so fortunate to have George Lewis working with us on the home site prep and excavation, we are just as fortunate to have Todd Hawkes handling things for us from this point forward! AND come to find out, they used to be brother-in-laws. Have I mentioned how small Dinwiddie County is?!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , | Leave a comment

Tropical Storm Karen

Tropical Storm Karen

uh oh

The team from Battle Creek Log Homes is due to arrive at the beginning of next week to start construction on the cabin. But wait a minute, tropical storm Karen is also due to arrive in our area at the beginning of next week. Hmmmm……..do you think that might pose a problem?

Categories: Follow the adventure as we build our log cabin | Tags: , , , | Leave a comment

lincoln logs, lumber, and windows, oh my!

October 1

We arrived at the lake around 7:30am to find George already there, waiting with his 6000lb all terrain fork-lift, ready to unload the logs once the trucks arrived. The three trucks were due around 8:00am, having driven down from Tennessee, carrying all the supplies from Battle Creek Log Homes that would be needed to construct our log cabin.

DSC_0111

Having some time to kill before their arrival, we walked down to the dock to enjoy the view of the lake for a bit.

We heard the loud sound of diesel engines in the distance and headed up the drive just as the trucks pulled into sight.

It didn’t take much to realize that there was no way the heavy trucks could make it up the driveway. So, as George had somewhat anticipated, the trucks would have to remain in the road and he would have to use the fork-lift to carry all 52 pallets of supplies from there, up the steep driveway to the top of hill, and scatter them around the building site.

Though time consuming, the unloading went smoothly till George picked up a giant pallet containing the heavy timbers for the roof, that didn’t quite fit between the trees that line the driveway.  No worries though- it seems that there is no difficulty that George can’t surmount!

Without a word, he lowered the pallet, jumped out of the fork-lift cab and onto his bulldozer. In no time, he had widened the driveway and was able to successfully bring the large pallet to the top of the hill.

The rest of the unloading went smoothly and seven hours later, they were done.

And me? I had three jobs:  taking photos, checking the pallet numbers off the list as they were unloaded, and bringing lunch back to the boys while they worked.  Two went well, the other, not so much…

Waffles faired much better. She had a big day chasing after Dave, supervising the work and swimming in the lake.  She slept soundly all the way home!

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , | Leave a comment

the pouring of the concrete…

Enter Kris Cutler, the other half of C & L Excavation.  

We had met Kris, what seems like forever ago, when we first met with George Lewis and Eric Riley, and walked the property with the three of them, discussing our proposed homesite, well and septic field, and getting their ideas for the driveway and what would be involved in clearing the land and laying the foundation.  Eric was already on site when we pulled up that morning, his pick up truck parked near the shed.  We introduced ourselves to him and were making small talk when we heard the distinct sound of a motorcycle approaching. We were all three somewhat surprised when a Harley Davidson pulled into the parking area and off jumped Kris Cutler.  Not the usual means of transport for a contractor!

As George Lewis handles the excavation side of the business, and Kris the construction end, once excavation began we didn’t see him again until it was time for the concrete slab to be poured.  When we arrived Thursday morning, the process was well underway and we found Kris on site along with the concrete team from Cowling Bros Building Supplies who had driven up from Waverly, Va to pour our basement slab. They were just finishing pouring the second truckload of concrete when we pulled up. A third arrived shortly there after to finish the job.

Meanwhile, Todd Hawkes had arrived, as well as Lacey Palmore from Southside Electric Cooperative.  They were meeting to discuss how and where the electric line would be brought in.  We had initially intended to have temporary power brought in for the log crew to use during construction, but after finding out that it was no longer a minimal fee, we decided it would be cheaper just to by a generator for them to use.  Probably not a bad thing to have around when you live in the woods anyway so not a huge deal to have to spend the extra money on one.

After the slab was poured, the crew unloaded a piece of equipment that looked somewhat like a cross between a giant fan and a hovercraft, and began to run it across the mostly dry slab.

While a few of the crew continued to smooth out the slab, the others began to work on the post supports for the deck.

Once the deck supports were done, the truck pulled around to the front to pour the front porch supports.

By the time the last post support was poured, the slab had mostly dried.  We decided at the last minute that it would be fun to leave our handprints in our future basement floor and were happy to find a shaded area that was still just wet enough.

DSC_0408

yep, another successful day at the coleman cabin

Categories: Follow the adventure as we build our log cabin | Tags: , , , , , , , , , , | Leave a comment